2
Training Level 2: Supervised Practice
Complete reading, pass quiz (80%), and complete 3 supervised order processing sessions.
1 Purpose

This SOP establishes the standardized process for receiving new wholesale orders from Distru, printing order documentation, and organizing orders for fulfillment at the Distribution Hub.

Proper order receiving ensures that all orders are accurately captured, prioritized correctly, and ready for the fulfillment team with complete documentation.

Compliance Context: This procedure is critical for maintaining accurate Metrc tracking from order creation through manifest generation. Missing or misfiled orders directly impact compliance and customer satisfaction.

2 Scope
In ScopeOut of Scope
  • All wholesale orders received via Distru
  • Orders from LeafLink synced to Distru
  • Rush/priority order identification
  • Order documentation printing
  • Physical order board organization
  • Order fulfillment/picking (see SOP 300.100.503)
  • Metrc manifest generation (see SOP 300.100.504)
  • Customer communication (see SOP 300.100.508)
  • Retail store orders (handled differently)
3 Definitions & Abbreviations
TermDefinition
DistruThe ERP system used for order management, inventory tracking, and compliance
LeafLinkB2B marketplace where customers can place orders (syncs to Distru)
Order BoardPhysical corkboard where printed orders are pinned by delivery route/date
Rush OrderOrder requiring same-day or next-day fulfillment outside normal schedule
Pick TicketPrinted document listing all items in an order for fulfillment
Delivery RouteGrouped orders by geographic area (Anchorage, Kenai, Fairbanks, Mat-Su)
4 Regulatory & Compliance
RegulationRequirement
3 AAC 306.745All transfers must be recorded in Metrc before physical movement
3 AAC 306.755Transportation manifests must match order contents exactly
Distru SOPOrders must be processed in Distru before physical fulfillment
5 Roles & Responsibilities
RoleResponsibilities
Hub SupervisorAccountable for order processing accuracy. Reviews rush orders. Escalates issues.
Fulfillment AgentResponsible for printing orders, organizing board, flagging issues.
CharleneConsulted on customer-specific instructions. Informed of order anomalies.
AxisCannaOps dashboard updates, automated order alerts, metrics tracking.
6 Equipment & Systems
ItemPurposeLocation
Computer w/ Distru AccessOrder management systemHub workstation
Printer (Brother HL-L2350DW)Print pick ticketsHub desk
Order Board (Corkboard)Physical order organizationHub wall
Colored PushpinsRoute/priority codingHub desk drawer
RUSH stickers (Red)Mark priority ordersSupply cabinet

Pin Color Coding:

  • 🔵 Blue — Anchorage Route (Thursday)
  • 🟢 Green — Kenai/Soldotna Route (Thursday PM)
  • 🟡 Yellow — Fairbanks Route (Wednesday)
  • 🟣 Purple — Mat-Su Route (Thursday)
  • 🔴 Red — RUSH/Same-Day (any route)
7 Prerequisites & Safety

Before starting order processing:

  • ✅ Logged into Distru with appropriate permissions
  • ✅ Printer loaded with paper and functioning
  • ✅ Order board cleared of completed/old orders
  • ✅ Supply of colored pins available
  • ✅ Previous day's orders verified as fulfilled or escalated

Safety: N/A — Office-based procedure. Standard ergonomic practices apply.

8 Procedure
⚠️ GOLDEN RULE

Every order must be printed, verified, and pinned before fulfillment begins. No verbal orders. No fulfillment from memory.

8.1 Morning Order Check (8:00 AM)

Step 1: Access Distru Orders

  1. Log into Distru → Orders → Filter: "Confirmed" status
  2. Sort by delivery date (earliest first)
  3. Note total order count for the day

Step 2: Review Each Order

For each new order, verify:

  • Customer name and license number
  • Delivery address (verify matches customer record)
  • Requested delivery date
  • Order notes/special instructions
  • All items have available inventory in Distru

Step 3: Print Pick Ticket

  1. Click order → Print → "Pick Ticket"
  2. Verify printout includes all items with SKUs
  3. Write delivery route on top right corner
  4. If RUSH order: Apply red RUSH sticker

Step 4: Pin to Order Board

  1. Select colored pin matching delivery route
  2. Pin order to appropriate section of board
  3. Arrange chronologically (earliest delivery date first)
  4. RUSH orders always pinned at TOP of their route section

8.2 Continuous Order Monitoring

Check Distru for new orders at minimum:

  • 8:00 AM — Morning check
  • 12:00 PM — Midday check
  • 4:00 PM — Afternoon check (last orders for next-day)

CannaOps sends automatic alerts for new orders during business hours.

8.3 LeafLink Sync Verification

Orders placed on LeafLink automatically sync to Distru. Verify sync by:

  1. Check LeafLink dashboard for pending orders
  2. Confirm matching order appears in Distru within 15 minutes
  3. If sync fails: Manually enter order in Distru and notify Charlene
9 Quality Control
CheckpointVerificationIf Failed
Order CompletenessAll items on pick ticket have inventoryFlag out-of-stock, notify customer
Customer VerificationLicense number valid in MetrcDo not process. Escalate to Charlene
Delivery DateDate is realistic for route scheduleContact customer to confirm/reschedule
Board OrganizationAll pending orders visible and pinnedRe-organize board, account for missing
10 Exception Handling
⚠️ GOLDEN RULE

When in doubt, STOP and ESCALATE. No employee will be penalized for asking questions.

ExceptionActionEscalate To
Out-of-stock item on orderFlag in Distru, notify CharleneCharlene → Customer
Invalid customer licenseDo NOT process. Document issue.Charlene → Marc
Rush order after 2 PMConfirm feasibility with Hub SupervisorHub Supervisor
LeafLink sync failureManual entry + IT ticketCharlene/Axis
Printer failureUse backup printer or handwriteHub Supervisor
11 Training Requirements
ComponentRequirement
Training LevelLevel 2: Supervised Practice
PrerequisitesDistru user account, Hub access badge
Video10 min — Order Receiving Walkthrough
Quiz10 questions, 80% pass rate
Supervised Practice3 order processing sessions with supervisor sign-off
RecertificationAnnual or after SOP update
13 Supporting Documents
  • 300.100.501.C1 — Daily Order Checklist
  • 300.100.501.G1 — Pin Color Guide (laminated, posted at board)
  • 300.100.501.R1 — Delivery Route Schedule
14 KPIs & Metrics
MetricTargetMeasurement
Order Processing Time< 15 min from receipt to pinnedDistru timestamp → Board time
Orders Missed0 per weekOrders not printed same day as received
Sync Failures< 2 per monthLeafLink orders requiring manual entry
Board Accuracy100%Weekly audit: pinned orders match Distru
15 Revision History
VersionDateAuthorChanges
v1.0March 22, 2026Axis / Marc TheilerInitial release — CannaOps conversion from legacy docs
16 Approval & Signatures
RoleNameSignatureDate
Prepared ByAxis (CannaOps)DigitalMarch 22, 2026
Reviewed ByCharlene
Approved ByMarc Theiler